Programme : Post SHMA Strategic Work Programme

The second component of the Post SHMA Strategic Work Programme is a project to study the existing Oxford Green Belt to see how it performs against the five purposes of green belt that are set out in law.

The study is the first of its kind since the Oxford Green Belt was formalised in the 1970s and gives a comprehensive picture of how well the Green Belt is performing for Oxfordshire.